Substation Scout

LG&E and KU request LGE-GIS-2010-001

LG&E and KU queue ID LGE-GIS-2010-001

Queue request LGE-GIS-2010-001 was listed in the LG&E and KU interconnection queue at the end of 2025 as a 690 MW gas project in Jefferson County, KY, according to Berkeley Lab’s queue data file. The filing names Cane Run Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2015.

Queue IDLGE-GIS-2010-001
Project nameNot reported
Status (as published)Active
SubstationCane Run Switching Station
Point of interconnectionCane Run Switching Station 138 kV
CountyJefferson
StateKY
Voltage138 kV
Capacity690 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2015-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Jefferson, KY: 12 requests in the LG&E and KU queue, 7 active totaling 3,236 MW.

Tracked changes

Not tracked. LG&E and KU rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityLouisville Gas & Electric and Kentucky Utilities Energy
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)LGIA signed
Queue date2010-04-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first