Queue IDProjectkVMWResourceStatus
LGE-GIS-2010-002 Not reported 345 704 Gas Withdrawn
LGE-GIS-2013-001 Not reported 138 691 Hybrid Active
LGE-GIS-2010-001 Not reported 138 690 Gas Active
LGE-CS2025-002 Not reported 345 680 Gas Active
LGE-GIS-2022-003 Not reported 345 660 Gas Active
LGE-GIS-2021-005 Not reported 345 635 Gas Withdrawn
LGE-CS2025-001 Not reported 138 400 Battery Active
LGE-GIS-2021-011 Not reported 138 300 Battery Withdrawn
LGE-GIS-2021-016 Not reported 138 250 Battery Withdrawn
LGE-GIS-2024-006 Not reported 138 94 Hybrid Active
LGE-GIS-2011-002 Not reported 138 30 Hybrid Withdrawn
LGE-GIS-2011-003 Not reported n/r 21 Hydro Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first