LG&E and KU request LGE-CS2025-013
LG&E and KU queue ID LGE-CS2025-013
Queue request LGE-CS2025-013 was listed in the LG&E and KU interconnection queue at the end of 2025 as a 100 MW solar project in Ballard County, KY, according to Berkeley Lab’s queue data file. The filing names Grahamville - Wickliffe line tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2028.
| Queue ID | LGE-CS2025-013 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Grahamville - Wickliffe line tap |
| Point of interconnection | Grahamville - Wickliffe 161kV line tap |
| County | Ballard |
| State | KY |
| Voltage | 161 kV |
| Capacity | 100 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2028-06-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Ballard, KY: 5 requests in the LG&E and KU queue, 1 active totaling 100 MW.
Tracked changes
Not tracked. LG&E and KU rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Louisville Gas & Electric and Kentucky Utilities Energy |
|---|---|
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Queue date | 2025-12-24 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.