Substation Scout

LG&E and KU request LGE-CS2025-013

LG&E and KU queue ID LGE-CS2025-013

Queue request LGE-CS2025-013 was listed in the LG&E and KU interconnection queue at the end of 2025 as a 100 MW solar project in Ballard County, KY, according to Berkeley Lab’s queue data file. The filing names Grahamville - Wickliffe line tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2028.

Queue IDLGE-CS2025-013
Project nameNot reported
Status (as published)Active
SubstationGrahamville - Wickliffe line tap
Point of interconnectionGrahamville - Wickliffe 161kV line tap
CountyBallard
StateKY
Voltage161 kV
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Ballard, KY: 5 requests in the LG&E and KU queue, 1 active totaling 100 MW.

Tracked changes

Not tracked. LG&E and KU rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityLouisville Gas & Electric and Kentucky Utilities Energy
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Queue date2025-12-24

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first