Ballard, KY interconnection queue

1 active project totaling 100 MW in the LG&E and KU queue, plus 4 with terminal status (shown grayed).

1active projects
100active MW
5total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2022-001 Not reported 161 125 Solar Withdrawn
LGE-GIS-2019-002 Not reported 161 104 Solar Withdrawn
LGE-CS2025-013 Not reported 161 100 Solar Active
LGE-GIS-2019-014 Not reported 161 100 Solar Withdrawn
LGE-GIS-2019-021 Not reported 69 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.