2 active projects totaling 906.2 MW in the ERCOT queue.

2 ERCOT queue filings name Tule Canyon Substation as the point of interconnection, all in Briscoe County, TX.

2active projects
906.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
29INR0397 Black Mountain Briscoe Gas 345 495.3 Gas SS Started, FIS Started, No IA
23INR0330 BRP Snowdon BESS 345 410.9 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.