Brazos Bend Solar SLF
ERCOT queue ID 29INR0163
| Queue ID | 29INR0163 |
|---|---|
| Project name | Brazos Bend Solar SLF |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Line () GRISTMILL_5 to () TNTNP_ONE_3 |
| Point of interconnection | 345 kV Line (3765) GRISTMILL_5 to (39950) TNTNP_ONE_3 |
| County | Milam |
| State | TX |
| Voltage | 345 kV |
| Capacity | 243 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2029-09-17 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Grenergy USA |
|---|---|
| Cdr Zone | SOUTH |
| Fuel Code | SOL |
| Technology Code | PV |
| Screening Study Complete | 45992 |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.