Dart Energy Storage A1

ERCOT queue ID 28INR0293 Terminal status

Queue ID28INR0293
Project nameDart Energy Storage A1
Status (as published)Inactive
SubstationTAP138KV # ABILENE MAPLE STREET - # ABILENE EAST
Point of interconnectionTAP138KV #6290 ABILENE MAPLE STREET - #6275 ABILENE EAST
CountyTaylor
StateTX
Voltage138 kV
Capacity50 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalised for filtering)
Target commercial operation2028-11-30
Source datasetinactive

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Terminal status 50 SS Completed, FIS Started, No IA → Inactive

Full change log →

Additional filed fields

Fuel CodeBattery Storage
Size CategoryLarge

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.