Black Hawk Solar

ERCOT queue ID 28INR0040

Queue ID28INR0040
Project nameBlack Hawk Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationSan Miguel () - Cruce () double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of .
Point of interconnectionSan Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027.
CountyDuval
StateTX
VoltageNot reported
Capacity251.3 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2030-12-31
Source datasetlarge

Additional filed fields

Interconnecting EntityACE DevCo NC, LLC
Cdr ZoneSOUTH
Fuel CodeSOL
Technology CodePV
Screening Study Complete45436
Water AvailabilityNot Required