Antonio Road BESS
ERCOT queue ID 27INR0090 Terminal status
| Queue ID | 27INR0090 |
|---|---|
| Project name | Antonio Road BESS |
| Status (as published) | Cancelled |
| Substation | Paige , bus , connecting to the existing substation via adding a breaker |
| Point of interconnection | Paige 138kV, bus 7308, connecting to the existing substation via adding a breaker |
| County | Bastrop |
| State | TX |
| Voltage | 138 kV |
| Capacity | 155.5 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalised for filtering) |
| Target commercial operation | 2027-06-01 |
| Source dataset | cancelled |
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Terminal status | 155.5 | SS Completed, FIS Started, No IA → Cancelled |
Additional filed fields
| Fuel Code | Battery Storage |
|---|---|
| Size Category | Large |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.