Running Iron Solar
ERCOT queue ID 26INR0258
| Queue ID | 26INR0258 |
|---|---|
| Project name | Running Iron Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Conoco - Black Cat |
| Point of interconnection | Tap 138kV Conoco 8138 - Black Cat 80124 |
| County | Matagorda |
| State | TX |
| Voltage | 138 kV |
| Capacity | 204.7 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2028-10-16 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Running Iron Solar, LLC |
|---|---|
| Cdr Zone | COASTAL |
| Fuel Code | SOL |
| Technology Code | PV |
| Screening Study Complete | 45313 |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.