Flying Kite Solar

ERCOT queue ID 25INR0304

Queue ID25INR0304
Project nameFlying Kite Solar
Status (as published)SS Completed, FIS Started, IA
SubstationTap the La Pryor (#) - Poblano (#)
Point of interconnectionTap the 138 kV La Pryor (#8008) - Poblano (#8009)
CountyZavala
StateTX
Voltage138 kV
Capacity80.4 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2027-12-30
Source datasetlarge

Additional filed fields

Interconnecting EntityFLYING KITE SOLAR LLC
Cdr ZoneSOUTH
Fuel CodeSOL
Technology CodePV
Ia Signed45567
Screening Study Complete45112
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.