Long Point Solar II
ERCOT queue ID 24INR0390 Terminal status
| Queue ID | 24INR0390 |
|---|---|
| Project name | Long Point Solar II |
| Status (as published) | Inactive |
| Substation | Not reported |
| Point of interconnection | Not reported |
| County | Brazoria |
| State | TX |
| Voltage | Not reported |
| Capacity | 100.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | Not reported |
| Source dataset | inactive |
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Fuel Code | Solar |
|---|---|
| Size Category | Large |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.