Substation Scout

Razorbill Solar

ERCOT queue ID 22INR0244 Terminal status

Queue ID22INR0244
Project nameRazorbill Solar
Status (as published)Cancelled
Substationtap STP to Hillje Ckt 64
Point of interconnectiontap 345kV 5915 STP to 44200 Hillje 345kV Ckt 64
CountyMatagorda
StateTX
Voltage345 kV
Capacity240 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2027-12-15
Source datasetcancelled

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 240 SS Completed, FIS Started, No IA → Cancelled

Full change log →

Additional filed fields

Fuel CodeSolar
Size CategoryLarge

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.