Rodeo Solar
ERCOT queue ID 19INR0103
| Queue ID | 19INR0103 |
|---|---|
| Project name | Rodeo Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | NELSON SWITCH |
| Point of interconnection | 138kV 11273 NELSON SWITCH |
| County | Andrews |
| State | TX |
| Voltage | 138 kV |
| Capacity | 200 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2026-11-30 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Core Solar SPV I, LLC |
|---|---|
| Cdr Zone | WEST |
| Fuel Code | SOL |
| Technology Code | PV |
| Ia Signed | 43697 |
| Screening Study Complete | 42951 |
| Air Permit | Not Required |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.