Substation Scout

Brewster, TX interconnection queue

2 active projects totalling 228.9 MW in the ERCOT queue.

2active projects
228.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0271 Three Ranches Solar 138 125.5 Solar SS Completed, FIS Started, No IA
29INR0170 Three Ranches BESS 138 103.4 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.