Sutton Plant Substation substation interconnection queue

4 active projects totaling 41 MW in the Duke Energy queue.

4 Duke Energy queue filings name Sutton Plant Substation as the point of interconnection, all in New Hanover County, NC.

4active projects
41active MW
4total filed
Queue IDProjectkVMWResourceStatus
957712 Not reported 230 17 Gas Active
957670 Not reported 115 8 Gas Active
957687 Not reported 115 8 Gas Active
957709 Not reported 115 8 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first