Substation Scout

Smith substation interconnection queue

2 active projects totaling 81.8 MW in the Duke Energy queue.

2 Duke Energy queue filings name Smith as the point of interconnection, all in Richmond County, NC.

2active projects
81.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
PP00013 Not reported n/r 46.8 Gas Active
PP00014 Not reported n/r 35 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first