ROBINSON PLANT - FLORENCE substation interconnection queue

4 active projects totaling 294.8 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

5 Duke Energy queue filings name ROBINSON PLANT - FLORENCE as the point of interconnection, all in Darlington County, SC.

4active projects
294.8active MW
5total filed
Queue IDProjectkVMWResourceStatus
570382 Not reported 230 75 Solar Active
566478 Not reported 230 74.9 Solar Active
566518 Not reported 115 74.9 Solar Active
920651 Not reported 230 70 Solar Active
956840 Not reported 230 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.