ROBINSON PLANT - FLORENCE substation interconnection queue
4 active projects totaling 294.8 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).
5 Duke Energy queue filings name ROBINSON PLANT - FLORENCE as the point of interconnection, all in Darlington County, SC.
4active projects
294.8active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 570382 | Not reported | 230 | 75 | Solar | Active |
| 566478 | Not reported | 230 | 74.9 | Solar | Active |
| 566518 | Not reported | 115 | 74.9 | Solar | Active |
| 920651 | Not reported | 230 | 70 | Solar | Active |
| 956840 | Not reported | 230 | 50 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.