Substation Scout

LEE SUB - WOMMACK NORTH substation interconnection queue

3 active projects totaling 477 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

5 Duke Energy queue filings name LEE SUB - WOMMACK NORTH as the point of interconnection, all in NC.

3active projects
477active MW
5total filed
Queue IDProjectkVMWResourceStatus
897163 Not reported 230 260 Battery Active
956161 Not reported 230 150 Battery Active
569236 Not reported 230 73.9 Solar Withdrawn
917625 Not reported 230 73.9 Solar Withdrawn
920659 Not reported 230 67 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.