Queue request 897163 was listed in the Duke Energy interconnection queue at the end of 2025 as a 260 MW battery project in Wayne County, NC, according to Berkeley Lab’s queue data file. The filing names LEE SUB - WOMMACK NORTH as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID897163
Project nameNot reported
Status (as published)Active
SubstationLEE SUB - WOMMACK NORTH
Point of interconnectionLEE SUB - WOMMACK 230KV NORTH
CountyWayne
StateNC
Voltage230 kV
Capacity260 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

LEE SUB - WOMMACK NORTH substation: 5 requests in the Duke Energy queue, 3 active totaling 477 MW.

Queue IDProjectMWResourceStatus
956161Not reported150BatteryActive
920659Not reported67SolarActive
569236Not reported73.9SolarWithdrawn
917625Not reported73.9SolarWithdrawn

Wayne, NC: 36 requests in the Duke Energy queue, 23 active totaling 1,282.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
DeveloperDuke Energy Progress, LLC - HF Lee Energy - Storage
Cluster2023 DISIS
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Engineering Design - In Progress
Queue date2023-06-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first