Duke Energy queue ID PP00057

Queue request PP00057 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.9 MW project in Marlboro County, SC, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 1, 2028.

Queue IDPP00057
Project nameNot reported
Status (as published)Active
SubstationNot reported
Point of interconnectionNot reported
CountyMarlboro
StateSC
VoltageNot reported
Capacity74.9 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2028-07-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Marlboro, SC: 23 requests in the Duke Energy queue, 5 active totaling 309.7 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Provisional Interconnection Request Validation
Queue date2025-11-03

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.