Marlboro, SC interconnection queue

5 active projects totaling 309.7 MW in the Duke Energy queue, plus 18 with terminal status (shown grayed).

5active projects
309.7active MW
23total filed
Queue IDProjectkVMWResourceStatus
566096 Not reported 230 200 Solar Withdrawn
184484 Not reported 230 160 Solar Withdrawn
898445 Not reported 230 88.2 Solar Withdrawn
565074 Not reported 230 75 Solar Withdrawn
568444 Not reported 230 75 Solar Withdrawn
956538 Not reported 230 75 Solar Active
205718 Not reported n/r 74.9 Solar Withdrawn
917997 Not reported 230 74.9 Solar Withdrawn
957368 Not reported 230 74.9 Solar Active
962896 Not reported 230 74.9 Solar Withdrawn
PP00055 Not reported n/r 74.9 Other Active
PP00057 Not reported n/r 74.9 Other Active
569524 Not reported 230 60 Solar Withdrawn
897033 Not reported 230 60 Solar Withdrawn
919637 Not reported n/r 60 Solar Withdrawn
968547 Not reported 115 10 Solar Active
4540 Not reported 230 8 Solar Withdrawn
16326 Not reported 230 2 Solar Withdrawn
16327 Not reported 230 2 Solar Withdrawn
16328 Not reported 230 2 Solar Withdrawn
19156 Not reported 230 2 Solar Withdrawn
19170 Not reported 230 2 Solar Withdrawn
19176 Not reported 230 2 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.