Duke Energy queue ID PP00050

Queue request PP00050 was listed in the Duke Energy interconnection queue at the end of 2025 as a 65 MW project in Cumberland County, NC, according to Berkeley Lab’s queue data file. The filing names Clinton - Vander 115 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2029.

Queue IDPP00050
Project nameNot reported
Status (as published)Active
SubstationClinton - Vander 115
Point of interconnectionClinton - Vander 115
CountyCumberland
StateNC
VoltageNot reported
Capacity65 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2029-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cumberland, NC: 14 requests in the Duke Energy queue, 3 active totaling 204.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Tender Provisional Study Agreement
Queue date2025-09-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.