Cumberland, NC interconnection queue

3 active projects totaling 204.9 MW in the Duke Energy queue, plus 11 with terminal status (shown grayed).

3active projects
204.9active MW
14total filed
Queue IDProjectkVMWResourceStatus
24735 Not reported 230 1,235 Gas Withdrawn
24745 Not reported 500 1,235 Gas Withdrawn
958349 Not reported 115 156.5 Solar Withdrawn
568222 Not reported 230 74.9 Solar Withdrawn
918039 Not reported 230 74.9 Solar Withdrawn
962974 Not reported 230 74.9 Solar Withdrawn
977882 Not reported 230 74.9 Solar Active
963044 Not reported 115 65 Solar Active
PP00050 Not reported n/r 65 Other Active
956518 Not reported 230 50 Battery Withdrawn
132808 Not reported n/r 38 Other Withdrawn
954798 Not reported 115 31.6 Solar Withdrawn
8359 Not reported 115 30 Solar Withdrawn
119904 Not reported 230 18.4 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first