Duke Energy request PP00043

Duke Energy queue ID PP00043

Queue request PP00043 was listed in the Duke Energy interconnection queue at the end of 2025 as a 80 MW project in Jones County, NC, according to Berkeley Lab’s queue data file. The filing names Havelock - New Bern 230 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 13, 2029.

Queue IDPP00043
Project nameNot reported
Status (as published)Active
SubstationHavelock - New Bern 230
Point of interconnectionHavelock - New Bern 230
CountyJones
StateNC
VoltageNot reported
Capacity80 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2029-12-13
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Jones, NC: 8 requests in the Duke Energy queue, 2 active totaling 160 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Provisional Interconnection Request Validation
Queue date2025-08-22

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.