Jones, NC interconnection queue

2 active projects totaling 160 MW in the Duke Energy queue, plus 6 with terminal status (shown grayed).

2active projects
160active MW
8total filed
Queue IDProjectkVMWResourceStatus
569290 Not reported 230 172.4 Solar Withdrawn
21933 Not reported 230 80 Solar Withdrawn
569086 Not reported 230 80 Solar Withdrawn
917353 Not reported n/r 80 Solar Withdrawn
917429 Not reported n/r 80 Solar Withdrawn
962748 Not reported n/r 80 Solar Active
962986 Not reported n/r 80 Solar Withdrawn
PP00043 Not reported n/r 80 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.