Jones, NC interconnection queue
2 active projects totaling 160 MW in the Duke Energy queue, plus 6 with terminal status (shown grayed).
2active projects
160active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 569290 | Not reported | 230 | 172.4 | Solar | Withdrawn |
| 21933 | Not reported | 230 | 80 | Solar | Withdrawn |
| 569086 | Not reported | 230 | 80 | Solar | Withdrawn |
| 917353 | Not reported | n/r | 80 | Solar | Withdrawn |
| 917429 | Not reported | n/r | 80 | Solar | Withdrawn |
| 962748 | Not reported | n/r | 80 | Solar | Active |
| 962986 | Not reported | n/r | 80 | Solar | Withdrawn |
| PP00043 | Not reported | n/r | 80 | Other | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.