Duke Energy request PP00038
Duke Energy queue ID PP00038
Queue request PP00038 was listed in the Duke Energy interconnection queue at the end of 2025 as a 50 MW project in Nash County, NC, according to Berkeley Lab’s queue data file. The filing names Spring Hope 115 Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 30, 2029.
| Queue ID | PP00038 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Spring Hope 115 Switching Station |
| Point of interconnection | Spring Hope 115 Switching Station |
| County | Nash |
| State | NC |
| Voltage | Not reported |
| Capacity | 50 MW |
| Resource (as published) | Other |
| Resource category | Other (normalized for filtering) |
| Proposed online date | 2029-04-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Nash, NC: 8 requests in the Duke Energy queue, 3 active totaling 180 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Progress |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Tender Provisional Study Agreement |
| Queue date | 2025-07-25 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.