Nash, NC interconnection queue
3 active projects totaling 180 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).
3active projects
180active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 565492 | Not reported | 115 | 138 | Battery | Withdrawn |
| 948720 | Not reported | n/r | 80 | Solar | Active |
| 30708 | Not reported | 230 | 78.3 | Solar | Withdrawn |
| 564638 | Not reported | 230 | 78.3 | Solar | Withdrawn |
| 910009 | Not reported | 230 | 78.3 | Solar | Withdrawn |
| 956958 | Not reported | 230 | 78.3 | Solar | Withdrawn |
| 956218 | Not reported | 115 | 50 | Battery | Active |
| PP00038 | Not reported | n/r | 50 | Other | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.