Nash, NC interconnection queue

3 active projects totaling 180 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).

3active projects
180active MW
8total filed
Queue IDProjectkVMWResourceStatus
565492 Not reported 115 138 Battery Withdrawn
948720 Not reported n/r 80 Solar Active
30708 Not reported 230 78.3 Solar Withdrawn
564638 Not reported 230 78.3 Solar Withdrawn
910009 Not reported 230 78.3 Solar Withdrawn
956958 Not reported 230 78.3 Solar Withdrawn
956218 Not reported 115 50 Battery Active
PP00038 Not reported n/r 50 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.