Duke Energy request PP00033

Duke Energy queue ID PP00033

Queue request PP00033 was listed in the Duke Energy interconnection queue at the end of 2025 as a 6.3 MW hydro project in Montgomery County, NC, according to Berkeley Lab’s queue data file. The filing names Tillery Hydroelectric Plant Switchyard (T1590) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 5, 2026.

Queue IDPP00033
Project nameNot reported
Status (as published)Active
SubstationTillery Hydroelectric Plant Switchyard (T1590)
Point of interconnectionTillery Hydroelectric Plant Switchyard (T1590)
CountyMontgomery
StateNC
VoltageNot reported
Capacity6.3 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2026-06-05
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Montgomery, NC: 10 requests in the Duke Energy queue, 3 active totaling 18.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Tender Provisional Study Agreement
Queue date2025-06-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.