Queue request PP00029 was listed in the Duke Energy interconnection queue at the end of 2025 as a 63.9 MW project in Marion County, SC, according to Berkeley Lab’s queue data file. The filing names Florence DuPont - Marion 115 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 31, 2027.

Queue IDPP00029
Project nameNot reported
Status (as published)Active
SubstationFlorence DuPont - Marion 115
Point of interconnectionFlorence DuPont - Marion 115
CountyMarion
StateSC
VoltageNot reported
Capacity63.9 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2027-10-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Marion, SC: 11 requests in the Duke Energy queue, 8 active totaling 286.7 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Pending Provisional Interconnection Study Review Meeting
Queue date2025-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.