Marion, SC interconnection queue

8 active projects totaling 286.7 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).

8active projects
286.7active MW
11total filed
Queue IDProjectkVMWResourceStatus
17658 Not reported n/r 80 Solar Withdrawn
917501 Not reported 115 74.9 Solar Withdrawn
962968 Not reported 115 74.9 Solar Active
PP00056 Not reported n/r 74.9 Other Active
917739 Not reported 115 63.9 Solar Active
PP00029 Not reported n/r 63.9 Other Active
977878 Not reported 115 3.2 Solar Active
956534 Not reported 115 2.4 Solar Withdrawn
20832 Not reported 115 2 Solar Operational
21892 Not reported 115 2 Solar Active
956474 Not reported 230 1.9 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.