Substation Scout

Duke Energy request FC100383

Duke Energy queue ID FC100383

Queue request FC100383 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.9 MW solar project in Liberty County, FL, according to Berkeley Lab’s queue data file. The filing names FC100018 Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2029.

Queue IDFC100383
Project nameNot reported
Status (as published)Active
SubstationFC100018 Switching Station
Point of interconnectionFC100018 Switching Station
CountyLiberty
StateFL
VoltageNot reported
Capacity74.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2029-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Liberty, FL: 4 requests in the Duke Energy queue, 2 active totaling 149.8 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperDuke Energy Florida, LLC
ClusterCluster: 2025 Annual DEF FERC Cluster; Cluster Sub Group: North
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Queue date2025-12-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.