Duke Energy request FC100004
Duke Energy queue ID FC100004
Queue request FC100004 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.9 MW solar project in Sumter County, FL, according to Berkeley Lab’s queue data file. The filing names Central Florida to Holder as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2028.
| Queue ID | FC100004 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Central Florida to Holder |
| Point of interconnection | Central Florida to Holder 230kV |
| County | Sumter |
| State | FL |
| Voltage | 230 kV |
| Capacity | 74.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2028-06-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Sumter, FL: 8 requests in the Duke Energy queue, 3 active totaling 224.7 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Florida |
|---|---|
| Developer | Duke Energy Florida, LLC |
| Cluster | Cluster: 2024 Annual DEF FERC Cluster; Cluster Sub Group: Coastal |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Pending |
| Study phase (as the queue printed it) | Interconnection Agreement - Pending |
| Queue date | 2024-11-27 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.