Queue request FC100004 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.9 MW solar project in Sumter County, FL, according to Berkeley Lab’s queue data file. The filing names Central Florida to Holder as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2028.

Queue IDFC100004
Project nameNot reported
Status (as published)Active
SubstationCentral Florida to Holder
Point of interconnectionCentral Florida to Holder 230kV
CountySumter
StateFL
Voltage230 kV
Capacity74.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sumter, FL: 8 requests in the Duke Energy queue, 3 active totaling 224.7 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperDuke Energy Florida, LLC
ClusterCluster: 2024 Annual DEF FERC Cluster; Cluster Sub Group: Coastal
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Interconnection Agreement - Pending
Queue date2024-11-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first