Sumter, FL interconnection queue
3 active projects totaling 224.7 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).
3active projects
224.7active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 8 | Not reported | 230 | 1,150 | Nuclear | Withdrawn |
| 144 | Not reported | n/r | 560 | Hybrid | Withdrawn |
| 321 | Not reported | n/r | 74.9 | Solar | Operational |
| 322 | Not reported | n/r | 74.9 | Solar | Active |
| FC100004 | Not reported | 230 | 74.9 | Solar | Active |
| 233 | Not reported | n/r | 74.5 | Solar | Withdrawn |
| 266 | Not reported | n/r | 74.5 | Solar | Withdrawn |
| 271 | Not reported | n/r | 74.5 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.