Duke Energy request 978034

Duke Energy queue ID 978034

Queue request 978034 was listed in the Duke Energy interconnection queue at the end of 2025 as a 30 MW coal project in Forsyth County, NC, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Active”.

Queue ID978034
Project nameNot reported
Status (as published)Active
SubstationNot reported
Point of interconnectionNot reported
CountyForsyth
StateNC
VoltageNot reported
Capacity30 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Forsyth, NC: 3 requests in the Duke Energy queue, 2 active totaling 60 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2025 DISIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study - Study Complete
Queue date2025-05-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first