Substation Scout

Forsyth, NC interconnection queue

2 active projects totaling 60 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

2active projects
60active MW
3total filed
Queue IDProjectkVMWResourceStatus
566928 Not reported n/r 100 Solar Withdrawn
978034 Not reported n/r 30 Coal Active
978035 Not reported n/r 30 Coal Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first