Duke Energy request 977263
Duke Energy queue ID 977263
Queue request 977263 was listed in the Duke Energy interconnection queue at the end of 2025 as a 150 MW project in Durham County, NC, according to Berkeley Lab’s queue data file. The filing names Durham Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”.
| Queue ID | 977263 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Durham Substation |
| Point of interconnection | Durham 500KV Substation - 230kV |
| County | Durham |
| State | NC |
| Voltage | 500 kV |
| Capacity | 150 MW |
| Resource (as published) | Other |
| Resource category | Other (normalized for filtering) |
| Proposed online date | Not reported |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Durham, NC: 6 requests in the Duke Energy queue, 4 active totaling 504 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Progress |
|---|---|
| Cluster | 2025 DISIS |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Phase 1 Cluster Study - Study Complete |
| Queue date | 2025-06-23 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.