Substation Scout

Durham, NC interconnection queue

4 active projects totaling 504 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

4active projects
504active MW
6total filed
Queue IDProjectkVMWResourceStatus
977296 Not reported 100 199 Battery Active
977263 Not reported 500 150 Other Active
PP00040 Not reported n/r 150 Other Active
900495 Not reported 100 49.9 Battery Withdrawn
186310 Not reported n/r 23.3 Battery Withdrawn
977895 Not reported 230 5 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first