Duke Energy request 955167

Duke Energy queue ID 955167

Queue request 955167 was listed in the Duke Energy interconnection queue at the end of 2025 as a 73 MW solar project in Johnston County, NC, according to Berkeley Lab’s queue data file. The filing names SELMA - WAKE as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 23, 2026.

Queue ID955167
Project nameNot reported
Status (as published)Active
SubstationSELMA - WAKE
Point of interconnectionSELMA - WAKE 230KV
CountyJohnston
StateNC
Voltage230 kV
Capacity73 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-12-23
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Johnston, NC: 8 requests in the Duke Energy queue, 4 active totaling 117.1 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Cluster2022 DISIS
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Construction - In Progress
Queue date2022-06-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.