Johnston, NC interconnection queue

4 active projects totaling 117.1 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

4active projects
117.1active MW
8total filed
Queue IDProjectkVMWResourceStatus
31968 Not reported n/r 602 Gas Withdrawn
955167 Not reported 230 73 Solar Active
569234 Not reported 230 51.7 Solar Withdrawn
26829 Not reported 230 50 Solar Withdrawn
897247 Not reported 230 30.5 Other Active
897773 Not reported 230 10 Other Active
957223 Not reported 230 3.6 Solar Active
957452 Not reported n/r 3 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.