Substation Scout

Duke Energy request 899759

Duke Energy queue ID 899759

Queue request 899759 was listed in the Duke Energy interconnection queue at the end of 2025 as a 136 MW gas project in Catawba County, NC, according to Berkeley Lab’s queue data file. The filing names Marshall Steam Station Switchyard as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 31, 2028.

Queue ID899759
Project nameNot reported
Status (as published)Active
SubstationMarshall Steam Station Switchyard
Point of interconnectionMarshall Steam Station 230KV Switchyard
CountyCatawba
StateNC
Voltage230 kV
Capacity136 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2028-08-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Catawba, NC: 2 requests in the Duke Energy queue, 1 active totaling 136 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2023 DISIS
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Engineering Design - Pending
Queue date2023-06-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.