Substation Scout

Catawba, NC interconnection queue

1 active project totaling 136 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

1active projects
136active MW
2total filed
Queue IDProjectkVMWResourceStatus
191136 Not reported n/r 920 Gas Withdrawn
899759 Not reported 230 136 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first