Duke Energy request 899433

Duke Energy queue ID 899433

Queue request 899433 was listed in the Duke Energy interconnection queue at the end of 2025 as a 6.3 MW hydro project in Montgomery County, NC, according to Berkeley Lab’s queue data file. The filing names Tillery Hydro Plant Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID899433
Project nameNot reported
Status (as published)Active
SubstationTillery Hydro Plant Substation
Point of interconnectionTillery Hydro Plant Substation
CountyMontgomery
StateNC
VoltageNot reported
Capacity6.3 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Montgomery, NC: 10 requests in the Duke Energy queue, 3 active totaling 18.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
DeveloperDuke Energy Progress, LLC
Cluster2023 DISIS
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Construction - Pending
Queue date2023-06-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.