Duke Energy request 898997
Duke Energy queue ID 898997
Queue request 898997 was listed in the Duke Energy interconnection queue at the end of 2025 as a 199.9 MW battery project in Rutherford County, NC, according to Berkeley Lab’s queue data file. The filing names Cliffside Tie Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”.
| Queue ID | 898997 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Cliffside Tie Substation |
| Point of interconnection | Cliffside Tie Substation |
| County | Rutherford |
| State | NC |
| Voltage | Not reported |
| Capacity | 199.9 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | Not reported |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Rutherford, NC: 2 requests in the Duke Energy queue, 2 active totaling 298.9 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Carolinas |
|---|---|
| Cluster | 2023 DISIS |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Facility Study |
| Study phase (as the queue printed it) | Facility Study - Restudy |
| Queue date | 2023-06-27 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.