Duke Energy request 898997

Duke Energy queue ID 898997

Queue request 898997 was listed in the Duke Energy interconnection queue at the end of 2025 as a 199.9 MW battery project in Rutherford County, NC, according to Berkeley Lab’s queue data file. The filing names Cliffside Tie Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID898997
Project nameNot reported
Status (as published)Active
SubstationCliffside Tie Substation
Point of interconnectionCliffside Tie Substation
CountyRutherford
StateNC
VoltageNot reported
Capacity199.9 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Rutherford, NC: 2 requests in the Duke Energy queue, 2 active totaling 298.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2023 DISIS
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)Facility Study - Restudy
Queue date2023-06-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.