Rutherford, NC interconnection queue

2 active projects totaling 298.9 MW in the Duke Energy queue.

2active projects
298.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
898997 Not reported n/r 199.9 Battery Active
956240 Not reported 100 99 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.