Duke Energy request 894253
Duke Energy queue ID 894253
Queue request 894253 was listed in the Duke Energy interconnection queue at the end of 2025 as a 2.8 MW project in Cleveland County, NC, according to Berkeley Lab’s queue data file. The filing names Lawndale as its point of interconnection. Its status as of December 31, 2025 was “Active”.
| Queue ID | 894253 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Lawndale |
| Point of interconnection | Lawndale |
| County | Cleveland |
| State | NC |
| Voltage | Not reported |
| Capacity | 2.8 MW |
| Resource (as published) | Other |
| Resource category | Other (normalized for filtering) |
| Proposed online date | Not reported |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Cleveland, NC: 4 requests in the Duke Energy queue, 4 active totaling 905.2 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Carolinas |
|---|---|
| Cluster | 2023 DISIS |
| Interconnection service | Other |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Construction - Pending IA/Customer Payment |
| Queue date | 2000-01-01 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.