Substation Scout

Cleveland, NC interconnection queue

4 active projects totaling 905.2 MW in the Duke Energy queue.

4active projects
905.2active MW
4total filed
Queue IDProjectkVMWResourceStatus
977564 Not reported n/r 810 Gas Active
977565 Not reported n/r 88.4 Gas Active
977896 Not reported n/r 4 Solar Active
894253 Not reported n/r 2.8 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first