Duke Energy queue ID 572354

Queue request 572354 was listed in the Duke Energy interconnection queue at the end of 2025 as a 28.3 MW solar project in Cherokee County, SC, according to Berkeley Lab’s queue data file. The filing names Thicketty as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2027.

Queue ID572354
Project nameNot reported
Status (as published)Active
SubstationThicketty
Point of interconnectionThicketty 44 kV
CountyCherokee
StateSC
Voltage44 kV
Capacity28.3 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Thicketty substation: 2 requests in the Duke Energy queue, 1 active totaling 28.3 MW.

Queue IDProjectMWResourceStatus
126064Not reported30SolarWithdrawn

Cherokee, SC: 8 requests in the Duke Energy queue, 1 active totaling 28.3 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2022 DISIS
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Engineering Design - In Progress
Queue date2022-06-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.