Cherokee, SC interconnection queue

1 active project totaling 28.3 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).

1active projects
28.3active MW
8total filed
Queue IDProjectkVMWResourceStatus
564266 Not reported n/r 757 Gas Withdrawn
569364 Not reported n/r 757 Gas Withdrawn
21177 Not reported n/r 741 Gas Withdrawn
957043 Not reported 230 500 Gas Withdrawn
976884 Not reported n/r 400 Gas Withdrawn
957101 Not reported n/r 156.3 Gas Withdrawn
126064 Not reported n/r 30 Solar Withdrawn
572354 Not reported 44 28.3 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.