Duke Energy request 569804
Duke Energy queue ID 569804
Queue request 569804 was listed in the Duke Energy interconnection queue at the end of 2025 as a 54 MW solar project in Spartanburg County, SC, according to Berkeley Lab’s queue data file. The filing names Avon WH as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 31, 2028.
| Queue ID | 569804 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Avon WH |
| Point of interconnection | Avon WH 100 kV |
| County | Spartanburg |
| State | SC |
| Voltage | 100 kV |
| Capacity | 54 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2028-03-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Spartanburg, SC: 10 requests in the Duke Energy queue, 3 active totaling 155.5 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Carolinas |
|---|---|
| Cluster | 2022 DISIS |
| Interconnection service | Other |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Engineering Design - In Progress |
| Queue date | 2022-06-29 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.